Sunday, January 3, 2010

To Do Before Driveable...

Engine
  • Install hotpipe
  • Install air cleaner
  • Attach fuel feed and return lines
  • Install downpipe
  • Install testpipe and catback system
  • Install clutch line
  • Fill and bleed clutch fluid
  • Check driveshaft bolt torque
  • Install spark plugs
  • Fill and pressure check cooling system
  • Fill engine oil
  • Crank over engine without injectors to circulate oil
  • Sort out vacuum hose routing (EGR and Canister Control Solenoid Valve, Brake Booster, etc.) 

Electrical
  • Install and complete wire harness

Chassis
  • Install tie rods
  • Install front pads and rotors
  • Install front brake lines
  • Complete brake hard line install
  • Install rear brake lines
  • Fill and bleed brake fluid
  • Order and install steering rack bolts
  • Check tire pressure

Body
  • Fit and install bumper support
  • Fit and install bumper
  • Install hood pins

1 comment: